The tools are packed, the tech says the system is running, and the easy move is to sign the completion slip and let the crew leave. The walkthrough after the install is where you find out what was left undone. The installer is still on site, so this is when fixes are cheapest and easiest to get, so use it.

Check every connection while the crew is still there

Stand at each joint with the tech present. Look at every fitting on the supply and drain sides, the bypass valve and its handles, the drain line where it meets the drain or standpipe, and any power cord or plug. Ask the tech to show you where the main shutoff is and which way it turns. Run a fixture or two and watch the connections while water is moving, not just while the system sits idle, because some leaks only show under flow.

Compare what was installed to what was quoted

Pull out the quote and check the installed unit against it: the model, the capacity or flow rating, the media or cartridge type, and every item listed as included. Note any difference and ask why it happened. Confirm the controls are set the way you agreed. Ask for the owner's manual and any product paperwork for the installed model, and make sure the settings the tech chose are written down somewhere you can find later.

Write the punch list on the spot

A punch list is a plain numbered list of what is unfinished or wrong. Each item should say what the problem is, where it is, and who is responsible for fixing it. Vague entries like 'fix the drain' invite arguments later. A useful entry reads more like 'drain line at the floor drain is not secured, installer to clamp it and check it.' Take a photo of each item. Keep one copy yourself and send the list to the company by email so there is a written record on their side too.

Agree on a fix window and what counts as done

For each item, ask when it will be fixed and who will come back to do it. Write the window next to the item. Define done in concrete terms. For a leak, done means a dry check after the system has gone through its normal running cycle, not a verbal assurance. Ask what happens if the fix does not hold and who you call when it fails.

Read what you are signing

A completion slip often says the work is finished and accepted. Before you sign, check whether that wording would close out the open items on your list. If it would, either write the open items onto the slip or hold off signing until the company confirms them in writing and agrees they remain its responsibility. Ask the office, not just the tech, because the tech may not be the person who handles the paperwork.

Keep the record in one place

Put the punch list, the photos, the model details, the settings sheet, and the manual in a single folder. As each item is fixed, note the date it was closed and who checked it. Keep the folder with your other home water system papers. You will need it if a question comes up later, if a repair is needed, or if you sell the home.