A newly installed softener needs a short commissioning period before it is trustworthy. Most of the checks happen while the installer is still on site, and a few happen over the following days.
Before the crew leaves
Ask the installer to show you the hardness setting they programmed and to confirm it matches the test result they used to set it. Ask for the regeneration schedule, the salt dose setting, and the time of day the regeneration will run. Have them write these settings on a sheet and put a copy in your folder with the model and serial numbers.
Check the bypass and the connections
Confirm which position of the bypass valve means treated water and which means bypass, and have the installer label both positions if they are not already marked. Look for drips at every connection, check that the drain line is secured and routed as planned, and confirm the drain has an air gap where your jurisdiction requires one. Open a cold tap and a hot tap and watch for pressure changes or air in the lines.
Watch the first regeneration
Ask when the first regeneration runs. If it is scheduled overnight, ask the installer what sounds, water flow, and brine activity are normal so you know what you are hearing. Check the drain once it finishes. After the cycle, test the water at a tap with a hardness strip or a kit if you have one, and write down the result next to the settings sheet.
The first week
Check the salt level and the brine condition at the end of the first week, and confirm the unit is still on the schedule you were given. If the water behaves differently from what the installer described, call them with the settings sheet and your readings in hand rather than adjusting the controls by guesswork.
What to keep for the handover
Keep the settings sheet, the warranty, the permit close-out if one was pulled, the equipment manual, the model and serial numbers, and the installer's direct phone number in one folder. Those documents answer most of the questions that come up later, and they matter if you ever sell the home.